What started as a weekend project has now turned into a 'couple of weekends' project. We've decided to take on updating the cabin's bathroom. Nate finished the basement, so we were fairly confident we could get it done. But, we hit a couple road blocks. Looking back, we should have realized we would. The house was built a VERY long time ago and very badly needed fixing. After the weekend is done though, we made very good progress. We'll be back up there next weekend to put the dock in, so hopefully we have time for some mud/taping too.
The bathroom before:
Door installed upside down (and of course you can hear through it...)



Demo-Is this a window that had paneling covering it? You bet it is..
End of weekend:
All of the walls are up including new tub surround. Left to do is install the new light (we couldn't find the fuse that controlled this light) and mud/tape and new floors. Not bad for a weekend project!